Services We Offer

Safety Is Our Biggest Concern

Past Projects














Burnaby Drainage

Burnaby Drainage

This site was completed for the City of Burnaby. A storm system update and creek bank reconstruction was needed and done by a construction contractor. Numerous indigenous trees and shrubs were supplied and planted by Alyon Inc. to restore this creek channel. Willow stakes were installed along the creek banks for stability and shade for the fish. On the upper levels, shrubs were planted to fill in the bare areas while still keeping the existing pedestrian trails. 

FRDT

Fraser River Debris Trap

As more debris has been floating down the Fraser River, an update of the Fraser River Debris Trap was needed. With the fluctuation of the river level, different types of plants were planted at each level. The lower level was planted with different semi-aquatic grasses. The middle level was planted with willow stakes to stabilize the bank. The willows are able to be under water during high water levels. The top of the bank was planted with shrubs to create shade and cover for wildlife.  

Silver Valley

Silver Valley 

A storm and surface water catch area was created for a new subdivision. Earthwork done by a construction contractor. Street trees were installed along with sod. Indigenous trees and shrubs were installed along the newly constructed creek in like clusters. Hydroseed was then installed in the area to help keep the moisture in the soil as well as to keep the weeds from becoming established. In the creek area, semi-aquatic grasses and rushes were installed. All trees and plants were supplied by Alyon Inc.